Uganda Electricity Generation Company (UEGCL) logo

7.26MW Okulacere Small Hydro Power Plant

Energy & UtilitiesMedium Priority

Run-of-river hydropower on Anyau River in Yumbe, West Nile. 2 Francis turbines, 24.7GWh/year. Feasibility by Tractebel (AFD grant).

Investment Range

USD 36 Million

Expected ROI

10-16% annually

Timeline

36-60 months

Market Size

USD 500M (untapped small hydro potential)

Investment Overview

The Okulacere Project is a run-of-river hydropower plant on the Anyau River in Yumbe district, West Nile.

Specifications: - Proposed capacity: 7.26MWp (Hydropower) - Design discharge: 6 m3/s - Ecological discharge: 0.85 m3/s - Annual energy production: 24.7 GWh/year - Turbines: 2 Francis turbines, each rated 3.63MW - Catchment area: 750 km2

Water conduit system runs 3km+ from dam to forebay. Power evacuated via 33kV double circuit line to Arua substation. Feasibility study finalised through French Government (AFD) grant, undertaken by Tractebel. Detailed environmental/social study to be done by prospective developer.

Key Investment Metrics

8% annually (electricity demand)

Grid-connected clean energy

120+ direct jobs

8-12 years

Government Incentives

Feed-in tariff guarantee
Tax holidays for power generators
VAT exemption on equipment

Required Licenses & Permits

Electricity Generation License
Water Permit
Environmental Impact Assessment

Risk Assessment

Key Risk

Environmental study pending, West Nile infrastructure

Contact Information

Uganda Electricity Generation Company (UEGCL)

Plot 28 Kampala Road, UIA House, Kampala

Quick Actions

Start Onboarding